Application
18428868 · MANAGING SYSTEM PRESSURE WITHIN SHEAR INDUCED FRACTURE FIELD DURING HYDRAULIC FRACTURING OPERATIONS TO INCREASE THE EFFECTIVE ENERGY THAT CAN BE DELIVERED INTO THE RESERVOIR
Filed 2024-01-31 · Granted The official file ↗ · Art unit 2857 · Examiner John H Le Easy · CPC E21B 47/008 · Halliburton Energy Services, Inc. · Delizio, Peacock, Lewin, & Guerra (Halliburton)
Office actions
1
first was Non-final rejection
RCEs
0
no appeal
To first action
26.8 mo
to disposition 31.3 mo
Statutes raised
·
0 actions read