Patent AnalyticsExaminers
Rankings

Company or institution

Sinclair Broadcast Group, Inc.

40 applicationsfiled 2013 to 2025

Allowance rate
81%
+6 pts vs the USPTO range 66% to 91%
Rejections before allowance
2.0
+0.4 vs the USPTO
Months to first action
12.9 mo
−5.7 vs the USPTO
Needed an RCE
54%
+27 pts vs the USPTO

Timeline

Applications by filing year: drag across the years to study a period

Allowed in green, abandoned in red, pending in grey. The figures above and the charts that can be recomputed by filing year follow the span you pick.

Compared with the office

Against every applicant before the USPTO

Unlock the comparison with the officeFree with an account. No card needed.

Create a free account

Trend

Allowance by filing year

Unlock the trendIncluded in Pro, from $29 a month. Cancel any time.

See plans Sign in

Domains

Where the applications fall

CPC subclasses

H04N Pictorial communication, television15 apps
G10L Speech analysis, synthesis, recognition11 apps
H04W Wireless communication networks6 apps
H04L Transmission of digital information4 apps
H04B Transmission1 apps
H04H 1 apps

Art units

24247 apps
24266 apps
24215 apps
26463 apps
24132 apps
24742 apps

Rejection fingerprint

What gets rejected, by statute

Share of parsed office actions raising each ground; blue is the USPTO.

Unlock the rejection fingerprintIncluded in Pro, from $29 a month. Cancel any time.

See plans Sign in

What works

Allowance by strategy used

Unlock what works for this filerIncluded in Pro, from $29 a month. Cancel any time.

See plans Sign in

Interviews

Does an interview help?

Unlock the interview figuresFree with an account. No card needed.

Create a free account

Applications

Every application in the record

ApplicationTitleFiledStatusRejectionsRCEsTo 1st action
19271962PRESENTATION, TIMING AND SCHEDULE MANAGEMENT FOR BROADCAST PROGRAMMING IN BETTING A…2025-07-17Pending1014.5 mo
19200015PRESENTATION, TIMING AND SCHEDULE MANAGEMENT FOR BROADCAST PROGRAMMING IN BETTING A…2025-05-06Pending1016.3 mo
18922722ATSC 3.0 MULTICAST-BROADCAST INTELLIGENT RAN TOPOLOGIES2024-10-22Pending00n/a
15670622Method and apparatus for adaptive signal processing2012-01-10Allowed1012.0 mo
15382065Composition and method for controlled release2015-02-11Abandoned4123.0 mo
15598599Distributed ledger transaction verification2018-03-12Allowed3020.0 mo
15906876Thermal management of battery assemblies2021-04-13Pending2117.0 mo
15865159Machine learning model for anomaly detection2012-05-14Allowed1014.0 mo
15673690Wireless power transfer coil arrangement2015-06-15Abandoned4125.0 mo
15330146Catalyst for selective hydrogenation2018-07-16Allowed3022.0 mo
Unlock all 40 applications, each with its full timelineIncluded in Pro, from $29 a month. Cancel any time.

See plans Sign in