Patent AnalyticsExaminers
Menu

Topic

Data center Steady

3,257 applications whose title mentions it. Its share of new filings over the last two years is 6% above the four years before.

Allowance rate
81%
+5 pts vs the USPTO 2,950 decided
Months to first action
19.1 mo
+0.5 vs the USPTO
Applications
3,257.0
in the record
Allowed
2,380.0
570 abandoned

Filings by year

How often the topic was filed

The most recent years are still filling in.

Applications

Recent applications on this topic

ApplicationTitleFiledStatusRejectionsRCEsTo 1st action
19621008DATA CENTER AND INFORMATION PROCESSING SYSTEM2026-09-03Pending00n/a
19609159INTELLIGENT HIGH-PRESSURE-RESISTANT HIGH-DENSITY UNDERWATER DATA CENTER AND DEPLOYM…2026-07-24Pending00n/a
19605050INSPECTION METHOD AND DATA CENTER INSPECTION METHOD2026-07-09Pending00n/a
15594678Method and apparatus for adaptive signal processing2012-01-10Allowed1012.0 mo
15385833Composition and method for controlled release2015-02-11Abandoned4123.0 mo
15198299Distributed ledger transaction verification2018-03-12Allowed3020.0 mo
15706497Thermal management of battery assemblies2021-04-13Pending2117.0 mo
15170638Machine learning model for anomaly detection2012-05-14Allowed1014.0 mo
15943719Wireless power transfer coil arrangement2015-06-15Abandoned4125.0 mo
15518251Catalyst for selective hydrogenation2018-07-16Allowed3022.0 mo
Unlock every application on this topic, with its timelineIncluded in Pro, from $29 a month. Cancel any time.

See plans Sign in